Coven Farm Brewood Road Coven Staffordshire WV9 5DB
Certificate of Lawfulness for storage of builders materials
Page shows planning applications in South Staffordshire in the postcode WV9 area . Search the list or the map, open an application to see the detail, and sign up for free alerts for your postcode.
Or · browse by postcode
Buying or renting? Get a Property Risk Report, including nearby planning.
Get a Property Risk ReportNewest first. Filter by type, or search a postcode, street or reference.
Certificate of Lawfulness for storage of builders materials
Extensions to include kitchen extension and en-suite
Erection of single garage
Additional bedroom
Outline permission for dwelling
Extensions to include garage, bedroom and en-suite
Extensions to include utility and porch
Extensions to include kitchen extension, bay window, entrance gates and screen wall
Extensions to include kitchen extension, bay window, entrance gates and screen wall
Alterations and extensions to include kitchen extension, extension to bedroom 2 and bathroom and bedroom 3 in roofspace
Extensions to include dining room, bedroom 4 and 5 and bathroom 3
Conservatory
Extensions to include enlarged lounge, kitchen, bedroom 1 and bedroom 3 and new bedroom 4.
Extensions to include enlarged kitchen and conservatory
First floor extension to bedroom
First floor extension to bedroom
Change of use of garden land to harstanding to provide access to cesspit
Verandah
Alterations and extensions including bathroom, conservatory, enlarged kitchen, 3 bedrooms on first floor and en-suite
Change of use to childrens home
Erection of conservatory
Erection of 5 bungalows and access way
Partial demolition and rebuilding of existing extension, new windows and repair work to existing structure
Extension to provide 2 bedrooms and en-suite bathroom
Extensions to provide covered entrance and front canopy
Detached double garage and two storey kitchen, utility,cloaks,dining room and bedroom extensions
Conservatory
Outline permission for residential development
Conservatory
Extension to provide porch
Additional pole for overhead line
Extensions to include enlarged garage, bedroom and en-suite
Security fence
Certificate of Lawfulness relating to industrial activities on land and buildings
Extensions to include enlarged lounge and kitchen, wc basement playroom, new bedroom and en-suite
Extension to provide enlarged bedroom 1 and en-suite
Enlarged kitchen
New window in dining room
U.P.V.C. lean-to
Change of use of store/workshop to provide annex accommodation
Loft conversion to provide 2 bedrooms and shower room
Extensions to provide conservatory and enlarged garage
Alterations and extensions to provide new detached double garage, conservatory and extension to existing garage to provide study,wc and cloaks
First floor extension
Extension to provide study/office space
Bay window to front and conservatory to rear
Bedroom extension
Loft conversion
Two storey extension to provide lounge, study and bedroom
Extensions to provide rear lounge, swimming pool, enlarged bedroom 2 and bedroom 4
Want to know when new applications appear in this area?
Alert me for this areaWhat people are talking about on the Landcycle forum.
Enter your postcode and email address, and we'll send new applications straight to your inbox.
You'll hear about new applications within 1 mile (1.6km) of your postcode.
Anyone can comment on a planning application. Your comment goes to the council's planning officer and is considered before a decision is made.
A Landcycle Property Risk Report shows nearby planning applications alongside Land Registry title information, flood risk and sold prices, before you commit.
Get a Property Risk ReportEvery application in WV9 follows the same broad path. Knowing where an application has got to tells you whether you can still influence it, and what might happen next.
The council checks the paperwork is complete, then publishes the plans and documents on its planning portal.
Neighbours, parish councils and bodies such as highways are consulted. The public usually has at least 21 days to comment.
Most applications are meant to be decided within 8 weeks, and major ones within 13. Bigger or contentious schemes can go to a planning committee.
Permission usually lasts 3 years and can come with conditions. If it's refused, the applicant can appeal to the Planning Inspectorate.
A busy postcode isn't always a sign of big change. Lots of applications can simply mean homeowners extending, trees being pruned or conditions being signed off. Look at the application type and the description to see what's really going on.
Councils can only weigh up planning matters, such as overlooking, traffic, design, noise and the effect on trees or heritage. Loss of a private view or a possible fall in property value usually carries no weight, so focus on the things they can act on.
| Full | Permission to build, extend or alter — including most house extensions. |
|---|---|
| Outline | Agrees the principle of a development before the detailed design. |
| Lawful development | A certificate confirming that an existing or proposed use or building work is lawful. |
| Amendment | Changes to something already approved, such as a different roof shape. |
| Conditions | Details submitted to meet conditions set in an earlier approval. |
| Heritage | Work to listed buildings or in historically significant areas. |
| Trees | Pruning or removing trees that are protected or in a conservation area. |
| Telecoms | Mobile phone masts, antennas and equipment cabinets. |
| Advertising | Signs, billboards and illuminated adverts. |
| Awaiting decision | The council is still considering the application. |
|---|---|
| Approved | Permission granted, often with conditions. |
| Refused | Permission not granted. The applicant may appeal. |
| Referred | Passed to another body or a higher authority to decide. |
| Withdrawn | The applicant withdrew it before a decision. |
| Allowed | The appeal succeeded and permission is granted. |
|---|---|
| Allowed with conditions | Permission granted with specific conditions attached. |
| Split decision | Part of the proposal allowed, part refused. |
| Dismissed | The appeal failed; the original decision stands. |
| Invalid | The appeal wasn't valid, for example it was submitted late. |
Advanced search, saved areas, site finding and alerts for your whole team.
Planning alerts for business →Planning data is compiled from publicly available local authority and government sources. Decisions and appeal outcomes can change as councils update their records, and some historic data may be incomplete. Always check the council's planning portal for the official record.