Page shows planning applications in West Sussex in the postcode BN18 area
which covers parts of Arundel, Binsted, Bury, Ford, Slindon, Walberton, Poling, Madehurst, Burpham, Barnham, Houghton, West Sussex
Planning Applications Map
Planning App Filters
?
Planning Applications List
The map above displays markers for different planning applications. Use the search box to zoom in and select planning applications in a certain area according to critera.
You can navigate the map by clicking and dragging, and you can zoom in and out using the "+" and "-" buttons on the the map.
Use the Search panel and zoom in to search all planning applications in a specific area or customise with a draw-a-search, and filter Application Size, Type, State, Planning Inspectorate Appeals (if any) and use logical AND, OR and NOT queries against the description.
These searches can be saved to your free landcycle account, and our system will continously monitor for new planning applications that match the criteria and send you an Alert when we find new ones.
You can also filter planning applications across the country, or in selected Local Authorities using the table below. These will be displayed on the map.
The redevelopment of the exisiting waste management facility. The replacement of existing offices and welfare facilities. Plus an additional weighbridge office and two weighbridges.
South Coast Skips Ltd, Units 9 & 10, Hangar 3, Rudford Industrial Estate, Ford Road, Ford, Arundel, BN18 0BD
Application under Section 73 to vary planning permission CM/22/06, by adding permission to process Plastic's (1000 tonnes per annum), Also paper recycling (1000 tonnes per annum), Also increase Cardboard recycling to 2500 tonnes per annum, no more than 100 tonne at anyone time to be stored onsite, at anyone time.
Construction of a kiosk which is required to provide a Motor Control Panel for a pumping station as well as to house mechanical parts and instruments for an accumulator.
Ford Wastewater Treatment Works, Ford Road, Ford, Arundel, BN18 0HY
Planning Permission for the Ford WWTW and Sludge Recycling Centre without complying with Conditions 19 and 20 of Planning Permission F/7/99 and Conditions 9 and 10 of F/008/00, to amend the method by which mitigation measures to control odour emissions from the works are secured.
Ford Wastewater Treatment Works, Ford Road, Ford, Arundel, BN18 0HY
Construction of a storage building which is required to provide a safe and weatherproof area for the storage of chemicals which are used during the normal operation of the works.
Ford Wastewater Treatment Works, Ford Road, Ford, Arundel, BN18 0HY
Change of use from mushroom production facility to in-vessel composting unit for green and kitchen waste to include new buildings, concrete maturation pad and perimeter fence.
The Vinery, Arundel Road, Poling, Arundel, BN18 9PY
proposed buildings to house in-vessel composting unit for green and kitchen waste, including maturation area, bio-filters, administration canteen building and perimeter fence.
The Vinery, Arundel Road, Poling, Arundel, BN18 9PY
Proposed buildings to house in-vessel composting unit for green and kitchen waste, including maturation area, bio-filters, administration.canteen building and perimeter fence (revised application)
The Vinery, Arundel Road, Poling, Arundel, BN18 9PY
Proposed new primary school, with associated access, external hard and soft play areas, landscaping and boundary treatment. Demolition of existing school.
Proposed change of use of partly implemented anaerobic digestion plant to a recycled cardboard and paper waste transfer station and horticulture distribution facility with alterations to previously consented building, new detached office building with associated infrastructure and works.
Demolition of existing buildings and structures and construction and operation of an energy recovery facility and a waste sorting and transfer facility for treatment of municipal, commercial and industrial wastes, including ancillary buildings, structures, parking, hardstanding, and landscape works
Ford Circular Technology Park, Ford Road, Ford BN18 0XL
Construction of material recycling facility to handle a maximum throughput of 15,500 TPA of construction and demolition/skip waste, with associated new yard area, stockpile area and weighbridge/office facility
T J Waste Ltd, Hanger No 8, Northwood Farm, Burndell Road, Yapton, Arundel, BN18 0HR
Change of use of existing hangar building from B2/B8 industrial/storage to sui generis, installation of combined heat and power plant, receipt of up to 15,000 tonnes per year of feedstock, generation and export of up to 1.25mW electricity and 5.5mW thermal and installation of HV meter cabinet.
South Coast Skip Hire, Unit H9-H10 Ford Road, Arundel, BN18 0BD
Proposed installation of a digestate lagoon with associated pipework and landscaping to replace the digestate lagoon approved under planning permission WSCC/061/16/F (WSCC/026/16/F as amended)
Land at Wicks Farm, Ford Lane, Ford, Arundel, BN18 0DF
Proposed extension to existing glasshouses; development of an on-farm anaerobic digestion plant and associated infrastructure for the generation of biomethane, CO2, electricity and heat, grid connection, digestate lagoon, access and landscaping
Land at Wicks Farm, Ford Lane, Ford, Arundel, BN18 0DF
Demolition of existing buildings and structures and construction and operation of an energy recovery facility and a waste sorting and transfer facility for treatment of municipal, commercial and industrial wastes, including ancillary buildings, structures, parking, hardstanding and landscape works
Ford Circular Technology Park, Ford Road, Ford, Arundel BN18 0XL
Proposed Inert Waste Recycling Facility, with new building, hardstanding, car parking, boundary treatment and re-aligned access to the agricultural unit. Includes variation to approved site landscaping and use of internal spaces within the existing MRF
T J Waste, Burndell Road, Yapton, Arundel, BN18 0HR
Decommissioning of existing pumping station, incorporating demolition of existing pump house building and the provision of a replacement pump station compound and access
Land adjacent to 36 Rodney Crescent, Ford, Arundel, BN18 0BL
By clicking 'Agree' you consent to receiving marketing emails from us (you can change this preference at any time) and the immediate performance of the contract and acknowledge that you thereby lose your right of withdrawal. See Terms and Conditions for more information.
Landcycle is not currently optimised for smaller screens. Please use a desktop or laptop to access the site.
Customize Consent Preferences
We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.
We also use third-party cookies that help us analyze how you use this website, store your preferences, and provide the content and advertisements that are relevant to you. These cookies will only be stored in your browser with your prior consent.
You can choose to enable or disable some or all of these cookies but disabling some of them may affect your browsing experience.
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
No cookies to display.
Functional
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
No cookies to display.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
_ga_
1 year 1 month 4 days
Google Analytics sets this cookie to store and count page views.
_ga
1 year 1 month 4 days
Google Analytics sets this cookie to calculate visitor, session and campaign data and track site usage for the site's analytics report. The cookie stores information anonymously and assigns a randomly generated number to recognise unique visitors.
_gid
1 day
Google Analytics sets this cookie to store information on how visitors use a website while also creating an analytics report of the website's performance. Some of the collected data includes the number of visitors, their source, and the pages they visit anonymously.
_gat_gtag_UA_
1 minute
Google Analytics sets this cookie to store a unique user ID.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
No cookies to display.
Advertisement
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.