Page shows planning applications in Gravesham in Fort Road RM18
The map above displays markers for different planning applications. Use the search box to zoom in and select planning applications in a certain area according to critera. You can navigate the map by clicking and dragging, and you can zoom in and out using the "+" and "-" buttons on the the map.
Use the Search panel and zoom in to search all planning applications in a specific area or customise with a draw-a-search, and filter Application Size, Type, State, Planning Inspectorate Appeals (if any) and use logical AND, OR and NOT queries against the description.
These searches can be saved to your free landcycle account, and our system will continously monitor for new planning applications that match the criteria and send you an Alert when we find new ones.
You can also filter planning applications across the country, or in selected Local Authorities using the table below. These will be displayed on the map.
uid | Authority | Size | State | Type | Decision | Appeal Ref. | Description | Address | Map | Earliest Date | Url | Share |
---|---|---|---|---|---|---|---|---|---|---|---|---|
20120818 | Gravesham | Small | Permitted | Not known | Consultation regarding outline application for works required on the Tilbury Power Station site (onshore application) to extend the lifetime by 12 - 15 years. | Tilbury Power Station Fort Road Tilbury Essex RM18 8UJ | 20/09/2028 | Link | Link | |||
20120819 | Gravesham | Small | Permitted | Not known | Consultation regarding outline application for works needed in or on the tidal Thames (offshore application) to extend Tilbury Power Station lifetime by 12 - 15 years. | Tilbury Power Station Fort Road Tilbury Essex RM18 8UJ | 20/09/2028 | Link | Link | |||
20160850 | Gravesham | Small | Conditions | Not known | Request for an Environmental Impact Assessment (EIA) Scoping Opinion in respect of (a): proposed redevelopment of land for use as a port in association with the existing Port of Tilbury, comprising a roll on/roll off (Ro-Ro) terminal, aggregates terminal including new and improved conveyors, external storage, improvements to existing land access, creation of hard surfaced pavements, erection of welfare buildings, improvements of an extensions to existing jetty including creation of new Ro-Ro berth and (b) construction of new and improved surface access to the land at the former Tilbury Power Station in association with the change of use and redevelopment of the land for port uses comprising new link road from Ferry Road (A1089) to Fort Road, (including associated changes to local highway and rights of way network) and formation of a rail spur and sidings. | Tilbury 2 Power Station Fort Road Tilbury Essex | 20/09/2001 | Link | Link | |||
20170388 | Gravesham | Small | Permitted | Not known | Continued re-profiling of the site 9 metres AOD using inert reclamation material imported by river, in place of Pulverised Fuel Ash from the adjacent now redundant Power Station. | Land Adjacent Tilbury Power Station Fort Road Tilbury Essex | 20/04/2011 | Link | Link | |||
20180386 | Gravesham | Small | Conditions | Not known | Consultation by the Planning Inspectorate in regard to a request made to the Secretary of State for a Scoping Opinion made under Regulations 10 and 11 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 in regard to a Scoping Report (RWE Reference: TEC/SR/Version 1) submitted by RWE in relation to a prospective NSIP made under the Planning Act 2008 (as amended) regarding a prospective Development Consent Order application for the Tilbury Energy Centre that will include:A) a new Combined Cycle Gas Turbine (CCGT) power station that will have a generating capacity up to 2500MW; B) peaking plant (typically Open Cycle Gas Turbines or OCGTs) with a capacity up to 299MW; andC) an energy storage facility up to 100MW.The above proposal also includes a new underground gas pipeline spur that will be constructed to supply gas to the station from the National Transmission System (NTS), located approximately 3km from the site. | Tilbury Energy Centre Fort Road Tilbury Essex | 20/04/2017 | Link | Link | |||
20180853 | Gravesham | Small | Conditions | Not known | Consultation is in regard to a request made to the Secretary of State for a Scoping Opinion made under Regulations 10 and 11 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 in regard to a Scoping Report (RPS Reference: OXF10872/July2018/Revision 8) submitted by RPS Group in relation to a prospective NSIP made under the Planning Act 2008 (as amended) regarding a prospective Development Consent Order application for: Construction and operation of:1) Reciprocating gas engines with rated electrical output totalling 600 MW;2) Batteries with rated electrical output of 150 MW and storage capacity of up to 600 MWh;3) Gas, electricity and potential cooling water connections, private access road(s) and minor public highway widening for delivery of large loads;4) Designation of replacement common land (exchange land) and possible creation of habitat for protected species translocation; and5) Possible transfer of land to Thurrock Council | Tilbury Power Station Fort Road Tilbury Essex | 20/08/2010 | Link | Link | |||
20190487 | Gravesham | Small | Permitted | Not known | Thurrock Council Consultation 19/00709/DCOAPP - Application by Port of Tilbury London Limited pursuant to Schedule 2, Part 1 (3) (f) of the Port of Tilbury (Expansion) Order 2019 for the approval of details of the external appearance of acoustic fencing to be constructed as part of Works Nos. 9 and 12. | Tilbury 2 Power Station Fort Road Tilbury Essex | 20/05/2013 | Link | Link | |||
20190886 | Gravesham | Small | Conditions | Not known | Thurrock Consultation 19/01278/DCOAPP - Application by Port of Tilbury London Limited pursuant to Schedule 2, Part 1 (3) of the Port of Tilbury (Expansion) Order 2019 for the approval of details of the external materials to be used in the construction of (a) the proposed ancillary buildings constructed as part of Work No. 3 (d) and (b) the proposed ancillary buildings constructed as part of Work No. 5 (c). | Tilbury Power Station Fort Road Tilbury Essex | 20/08/2021 | Link | Link | |||
20191074 | Gravesham | Small | Permitted | Not known | Thurrock Consultation 19/01468/DCOAPP - Application by Port of London Limited pursuant to Schedule 2, Part 1 (12) of the Port of Tilbury (Expansion) Order 2019 for the approval of details of the proposed operational lighting at the Port of Tilbury expansion. | Tilbury 2 Power Station Fort Road Tilbury Essex | 20/10/2007 | Link | Link | |||
20200041 | Gravesham | Small | Rejected | Not known | Thurrock Consultation 20/00047/DCOAPP - Application by Port of Tilbury London Limited pursuant to Schedule 2, Part 1 (10) of the Port of Tilbury (Expansion) Order 2019 for details of noise re-assessment, initial noise insulation and approval of an ongoing noise monitoring and mitigation scheme at the Port of Tilbury expansion. | Tilbury 2 Power Station Fort Road Tilbury Essex | 20/01/2014 | Link | Link | |||
20210067 | Gravesham | Small | Withdrawn | Not known | City Of London - London Port Health Authority consultation - Application for a permit to operate an installation - Tarmac Trading Limited - Tilbury Asphalt, located at East Tilbury, RM18 8UJ | Tilbury Asphalt Plant Fort Road Tilbury Essex RM18 8UJ | 20/01/2013 | Link | Link | |||
20211493 | Gravesham | Small | Undecided | Not known | Thurrock Consultation - 21/01928/FUL - Use of the land for external storage for a temporary period of no more than 5 years including the storage of new motor vehicles and miscellaneous port-related product (Area 2) with associated minor regrading of land using on-site inert material and importation of inert capping material. | Former Tilbury B Power Station Tilbury Riverside And Thurrock Park Fort Road Tilbury Essex RM18 8UL | 20/12/2002 | Link | Link | |||
20211494 | Gravesham | Small | Undecided | Not known | Thurrock Consultation - 21/01927/FUL - Use of the land for external storage for a temporary period of no more than 5 years including the storage of HGVs, new motor vehicles and miscellaneous port-related product (Area 1) with associated minor filling of existing concrete slab voids and installation of ramps at kerb edges where necessary using on-site inert material. | Former Tilbury B Power Station Tilbury Riverside And Thurrock Park Fort Road Tilbury Essex RM18 8UL | 20/12/2002 | Link | Link | |||
20220002 | Gravesham | Small | Conditions | Not known | Thurrock Consultation - 21/02177/FUL - Replacement pumping station and new outfall to the foreshore, including temporary construction compound areas and temporary changes to tidal defences at World's End pumping station, Fort Road, Tilbury. | Worlds End Pumping Station Fort Road Tilbury Essex RM18 7NR | 20/01/2005 | Link | Link | |||
20221349 | Gravesham | Small | Conditions | Not known | REF: 22/01461/FULRemoval of existing structures and buildings, re-grading of the land, laying of a concrete pavement, installation of upgraded drainage, lighting and security fencing and use of the land for port-related storage including haulier parking and/or storage of new motor vehicles and/or storage or port-related product with access from Tilbury2 port. | Marsh Farm Sewage Treatment Plant Fort Road Tilbury Essex | 20/12/2020 | Link | Link | |||
20240084 | Gravesham | Small | Conditions | Not known | Thurrock Consultation - Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting. | Land To The South Of National Grids Electrical Sub-station For New Cable Tunnel Fort Road Tilbury Essex | 20/01/2024 | Link | Link | |||
20240538 | Gravesham | Small | Conditions | Not known | Adjacent Authority Application for a Development Consent Order for Norwich to Tilbury. It is proposed by National Grid to upgrade the electricity transmission system in East Anglia between Norwich and Tilbury. The Project includes a new 400 kilovolt (kv) electricity transmission connection of approximately 184 kilometres (km) in overall length from Norwich Main Substation and Tilbury Substation via Bramford Substation. | Tilbury Power Station Fort Road Tilbury Essex | 20/06/2005 | Link | Link | |||
20240744 | Gravesham | Small | Undecided | Not known | Thurrock Re-Consultation - Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting. | Land To The South Of National Grids Electrical Sub-station For New Cable Tunnel Fort Road Tilbury Essex | 20/08/2014 | Link | Link | |||
20240897 | Gravesham | Small | Undecided | Not known | Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll) . | Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex | 20/10/2003 | Link | Link | |||
20250165 | Gravesham | Small | Undecided | Not known | Adjacent Authority Application for a Development Consent Order for Norwich to Tilbury. It is proposed by National Grid to upgrade the electricity transmission system in East Anglia between Norwich and Tilbury. The Project includes a new 400 kilovolt (kv) electricity transmission connection of approximately 184 kilometres (km) in overall length from Norwich Main Substation and Tilbury Substation via Bramford Substation. | Tilbury Power Station Fort Road Tilbury Essex | 20/02/2026 | Link | Link | |||
20250261 | Gravesham | Small | Undecided | Not known | Adjacent Authority Application for a Development Consent Order for Norwich to Tilbury. It is proposed by National Grid to upgrade the electricity transmission system in East Anglia between Norwich and Tilbury. The Project includes a new 400 kilovolt (kv) electricity transmission connection of approximately 184 kilometres (km) in overall length from Norwich Main Substation and Tilbury Substation via Bramford Substation. | Tilbury Power Station Fort Road Tilbury Essex | 20/03/2018 | Link | Link |
Application Type | Description | Example |
---|---|---|
Advertising | For displaying advertisements, signs, or billboards. | Applying to install a new illuminated sign outside a store. |
Amendment | Changes to previously approved applications, possibly due to design revisions. | Amending a previously approved house extension to change the roof style. |
Conditions | Applications related to meeting specific conditions set in previous approvals. | Submitting additional details required to fulfill conditions in an earlier planning consent. |
Full | A complete application for permission to develop land or alter structures. | Applying to build a new residential property on a vacant lot. |
Heritage | Applications in areas with historical significance or for listed buildings. | Seeking permission to repair a historic building’s facade. |
Other | For any application that doesn’t fall into the standard categories. | Applying to install an electric vehicle charging station. |
Outline | Initial application giving a general idea of development, without full detail. | Submitting an outline plan to build several houses on a large plot without detailed designs yet. |
Telecoms | Applications for telecom infrastructure, such as masts or antennas. | Seeking approval to erect a new mobile phone mast. |
Trees | Applications relating to tree management, like pruning or removal. | Requesting permission to remove a diseased tree on a property in a protected area. |
Application Status | Description | Example |
---|---|---|
Conditions | Application is being reviewed to confirm conditions are met before full approval. | Checking if drainage conditions for a housing project are satisfied. |
Permitted | Application has been approved, allowing the project to proceed. | A house extension application has been approved, so construction can start. |
Referred | Application referred to another agency or higher authority for further decision-making. | A new school building application referred to the Department of Education for review. |
Rejected | Application has been denied, possibly due to regulatory issues or community impact concerns. | A request to build a commercial property in a residential area was rejected. |
Undecided | Application is under review but no decision has been reached yet. | A solar panel installation application is still being considered. |
Unresolved | Decision is pending, possibly due to missing information or further clarifications needed. | Waiting on additional environmental impact reports before deciding on a manufacturing plant. |
Withdrawn | Applicant has withdrawn the application, ending the review process. | Applicant decided not to pursue a planning change and withdrew their application. |
Appeal Decision | Description | Example |
---|---|---|
Allowed | Appeal succeeded, and the application is approved. | An appeal to build a garden shed in a restricted area was allowed. |
Allowed in part | Only parts of the appeal are approved, with others declined. | Appeal for a large extension partially allowed, but balcony addition denied. |
Allowed with conditions | Appeal allowed but includes specific conditions. | Approval for a garage was granted but limited to certain construction hours. |
Dismissed | Appeal failed, and the original decision remains. | An appeal to build an additional floor on a building was dismissed. |
Invalid | Appeal was found invalid, likely due to procedural errors or missed deadlines. | An appeal filed late, beyond the deadline, was deemed invalid. |
Not yet decided | Appeal is still under review, with no decision made yet. | An appeal against the rejection of a new restaurant is pending review. |
Notice quashed | Original enforcement or refusal notice was overturned. | An enforcement notice on a fence height violation was quashed. |
Notice Upheld | Original enforcement or refusal notice stands. | Appeal against an enforcement notice for unauthorized work was upheld, so the notice remains in effect. |
Notice varied and upheld | Enforcement notice is modified but remains valid. | A notice to remove a deck was upheld, with only a minor reduction in required removal area. |
Planning permission granted | Appeal successful, and planning permission is now approved. | Appeal for planning permission to extend a house was granted. |
Quashed on legal grounds | Decision overturned due to a legal error in the original ruling. | Appeal quashed after finding procedural errors in the planning review process. |
Split Decision | Appeal partially approved and partially rejected. | Appeal for both front and back garden structures resulted in front approved, back rejected. |
Plot Id | Site Id | Site Name | Plot Name | Plot Active | Plot Interested | Plot Allow Contact | Contact Allow Contact | Contact Name | Contact House Name | Contact House Number | Contact Road Name | Contact Town Name | Contact City Name | Contact County Name | Contact Number | Contact Postcode | Plot Postcode | Market Value | Offer Value | Owner Value | Date of Last Letter | Date Added |
---|
Are you sure that you want logout?
Your privacy is important to us. That’s why we’ll never sell your data to third parties or use it without your consent.
We respect your time and won’t call you unless you ask us to.
We will give you £2.99 FREE credit to try the system without obligation.
And we won’t ask for your credit card details until you’re ready, giving you peace of mind while exploring our platform.
See pricing for reference
We've sent the verification code to your phone number:
Welcome to Landcycle!
To keep things secure we use One Time Passwords (OTPs) to verify your identity
Welcome to Landcycle!
To be reminded of the Email Adress you used to sign up to Landcycle, just enter your phone number and we will send it to you via SMS.
We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.
We also use third-party cookies that help us analyze how you use this website, store your preferences, and provide the content and advertisements that are relevant to you. These cookies will only be stored in your browser with your prior consent.
You can choose to enable or disable some or all of these cookies but disabling some of them may affect your browsing experience.
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.