Planning applications in Ealing in HA9

Page shows planning applications in Ealing in the postcode HA9 area which covers parts of London Borough of Brent, Wembley, Preston Road, Preston, Brent

Planning Applications Map

Planning Applications List

The map above displays markers for different planning applications. Use the search box to zoom in and select planning applications in a certain area according to critera. You can navigate the map by clicking and dragging, and you can zoom in and out using the "+" and "-" buttons on the the map.

Use the Search panel and zoom in to search all planning applications in a specific area or customise with a draw-a-search, and filter Application Size, Type, State, Planning Inspectorate Appeals (if any) and use logical AND, OR and NOT queries against the description.

These searches can be saved to your free landcycle account, and our system will continously monitor for new planning applications that match the criteria and send you an Alert when we find new ones.

You can also filter planning applications across the country, or in selected Local Authorities using the table below. These will be displayed on the map.

uid Authority Size State Type Decision Appeal Ref. Description Address Map Earliest Date Url Share lat lng UUID
170642CONS Ealing Small Permitted Outline Proposed variation of condition 3 (event cap, to allow 31 additional full capacity events) and removal of condition 33 (temporary traffic management) of planning permission reference 99/2400, which was for the complete demolition and redevelopment of the old stadium to provide a new 90,000-seat sports and entertainment stadium, offices and banqueting/conference facilities Wembley National Stadium Olympic Way Wembley HA9 0WS 31/01/2017 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?keyVal=OL4673JM09L00&activeTab=summary /planning-applications/local-authority/Ealing/uid/313730363432434F4E53 51.5567 -0.2797 7484326
185379CONS Ealing Small Permitted Outline Proposed variation of Condition 1 (event cap) of planning permission reference 17/0368 (dated 18/08/2017) to allow for 17 additional major sporting Tottenham Hotspur Football Club (THFC) events between 15 January 2019 and 12 May 2019 (Out of Borough Consultation from the London Borough of Brent) Wembley National Stadium Olympic Way Wembley HA9 0WS 13/11/2018 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?keyVal=PIJJ2GJM0GW00&activeTab=summary /planning-applications/local-authority/Ealing/uid/313835333739434F4E53 51.5567 -0.2797 3572685
241948CONS Ealing Small Permitted Outline Variation of conditions 1 (Event Cap) and 2 (Temporary Traffic Management) of Variation of Conditions reference 20/4197 dated 21 June, 2021, for Proposed variation of Condition 1 (event cap) of planning permission reference 18/4307 (varied permission for the construction of the stadium, dated 07/03/2019), to allow up to 9 additional major non-sporting events per event calendar year (Out of Borough) Wembley National Stadium Olympic Way Wembley HA9 0WS 20/05/2024 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?keyVal=SDVOZEJM0KW00&activeTab=summary /planning-applications/local-authority/Ealing/uid/323431393438434F4E53 51.5567 -0.2797 5307608
P/2002/3993 Ealing Not known Permitted Outline Demolition of existing school buildings and erection of mixed use commercial, residential and educational development (Consultation by London Borough of Brent) Copland Community School High Road Wembley Middlesex HA9 06/11/2002 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZW65JMTA592 /planning-applications/local-authority/Ealing/uid/502F323030322F33393933 5414422
P/2006/2916 Ealing Not known Withdrawn Outline Renewal of planning permission for the demolition of existing building and erection of part 11-storey and 17-storey building (duplicate application) (Out of Borough Consultation by Brent Council) 9 Park Lane Wembley HA9 7RH Middlesex 28/07/2006 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZW79JMTA266 /planning-applications/local-authority/Ealing/uid/502F323030362F32393136 51.554 -0.2929 5093982
P/2010/5012 Ealing Large Permitted Outline Outline application, accompanied by an Environmental Impact Assessment, for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m¦ of floorspace (GEA, excluding infrastructure) comprising: Retail/financial and professional services/food and drink (Use Class A1 to A5): 17,000m¦ to 30,000m¦ Business (Use Class B1): up to 25,000m¦; Hotel (Use Class C1): 5,000m¦ to 20,000m¦; Residential dwellings (Use Class C3): 65,000m¦ to 100,000m¦ (815 to 1,300 units); Community (Use Class D1): 1,500m¦ to 3,000m¦; Leisure and Entertainment (Use Class D2): up to 5,000m¦; Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m¦ to 25,000m¦; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way (Out of Borough) Former Palace Of Arts & Palace Of Industry Site Engineers Way Wembley HA9 07/12/2010 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?keyVal=ZZZW71JMTA323&activeTab=summary /planning-applications/local-authority/Ealing/uid/502F323031302F35303132 6055302
P/2011/1725 Ealing Large Withdrawn Outline NFA - Brent notifying LBE that APP going to committee Outline application, accompanied by an Environmental Impact Assessment, for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m¦ of floorspace (GEA, excluding infrastructure) comprising: Retail/financial and professional services/food and drink (Use Class A1 to A5): 17,000m¦ to 30,000m¦ Business (Use Class B1): up to 25,000m¦; Hotel (Use Class C1): 5,000m¦ to 20,000m¦; Residential dwellings (Use Class C3): 65,000m¦ to 100,000m¦ (815 to 1,300 units); Community (Use Class D1): 1,500m¦ to 3,000m¦; Leisure and Entertainment (Use Class D2): up to 5,000m¦; Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m¦ to 25,000m¦; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way. Former Palace Of Arts & Palace Of Industry Site Engineers Way Wembley HA9 28/04/2011 00:00:00 https://pam.ealing.gov.uk/online-applications/applicationDetails.do?keyVal=ZZZW6TJMTA522&activeTab=summary /planning-applications/local-authority/Ealing/uid/502F323031312F31373235 515550