Page shows planning applications in Cambridgeshire in the postcode PE7 area
which covers parts of Haddon, Whittlesey, Morborne, Holme, Folksworth, Farcet, Yaxley, Water Newton, Stilton, Cambridgeshire
Planning Applications Map
Planning App Filters
?
Planning Applications List
The map above displays markers for different planning applications. Use the search box to zoom in and select planning applications in a certain area according to critera.
You can navigate the map by clicking and dragging, and you can zoom in and out using the "+" and "-" buttons on the the map.
Use the Search panel and zoom in to search all planning applications in a specific area or customise with a draw-a-search, and filter Application Size, Type, State, Planning Inspectorate Appeals (if any) and use logical AND, OR and NOT queries against the description.
These searches can be saved to your free landcycle account, and our system will continously monitor for new planning applications that match the criteria and send you an Alert when we find new ones.
You can also filter planning applications across the country, or in selected Local Authorities using the table below. These will be displayed on the map.
Extension to existing site to allow for storage of vehicles, complementary to End of Life Vehicle Management on the existing site and the creation of an associated hard surface.Informative- This application seeks to continue the existing use at this site without compliance with planning permission H/5019/18/CW Condition numbers- 9 Definition of end of life vehicles and stacking height and Condition 11 restrictions on vehicle numbers.
Autoshells Ltd At Ashley Lodge Conquest Drove Farcet PE7 3DH
Proposed Demolition of two 85m brick built Chimneys, segregation, crushing, processing, grading of demolition material on site and exportation of demolition material
Land At Saxon Pit Peterborough Road Whittlesey Cambridgeshire PE7 1LQ
Importation, storage, processing including use of trommel, picking and recycling of incinerator bottom ash (IBA) and construction and demolition (C&D) waste, for exportation for use as incinerator bottom ash secondary aggregates (IBAA).
Former Saxon Brickworks Off Peterborough Road Whittlesey Cambridgeshire PE7 1PD
Proposed Demolition of two 85m brick built Chimneys, segregation, crushing, processing, grading of demolition material on site and exportation of demolition material.
Non-material amendment to allow the replacement of the 500mm clay cap placed over the filled material with the use of 1000mm of subsoils affecting condition 35 (the restoration plan) of planning permission F/2015/18/CW.
Development of Sir Harry Smith Community College from 6 forms of entry to 8 forms of entry with expansion of sixth form, including a two storey teaching block with link, pedestrian/cycle access to Drybread Road, construction access to Bassenhally/Drybread Road, alterations to sports pitches, alterations to parking arrangements, additional cycle parking and external landscaping works, fencing and floodlighting.
Sir Harry Smith Community College Eastrea Road Whittlesey Peterborough Cambridgeshire PE7 1XB
Section 73A planning application to continue the importation of controlled inert wastes for the buttressing, stabilisation and restoration of a former mineral excavation face together with an associated waste reception area.(Informative: application seeks to alter F/2015/18/CW to amend the timescale for restoration)
Land At Saxon Pit Peterborough Road Whittlesey Peterborough Cambridgeshire PE7 1PD
Discharge of condition application for conditions 29 (Pumping Apparatus) and 30 (Discharge of Water Off-Site) of planning permission F/2015/18/CW to continue the importation of controlled inert wastes for the buttressing, stabilisation and restoration of a former mineral excavation face together with an associated waste reception area without compliance with Conditions 5 (time limit for importation and deposit of waste fill), 6 (time limit for site preparation, buttressing, stabilisation and restoration), 35 (restoration programme),36 (submission of restoration and landscaping), and 39 (ecology management plan) with the cessation of importation and deposit of waste by 2 years from the date of the decision and the cessation of site preparation, buttressing, stabilisation and restoration by 2 years and 2 months from the date of the decision.
New Saxon Works Peterborough Road Whittlesey Peterborough Cambridgeshire PE7 1PD
Section 73A planning application to continue the importation of controlled inert wastes for the buttressing, stabilisation and restoration of a former mineral excavation face together with an associated waste reception area.
New Saxon Works Peterborough Road Whittlesey Peterborough Cambridgeshire PE7 1PD
Discharge of conditions 10 (Cycle Parking), 11 (Landscape and Biodiversity Scheme), and 12 (Landscape and Biodiversity Environmental Management Scheme) relating to planning permission ref: CCC/22/039/FUL, for Development of Sir Harry Smith Community College from 6 forms of entry to 8 forms of entry with expansion of sixth form, including a two-storey teaching block with link, pedestrian/cycle access to Drybread Road, construction access to Bassenhally/Drybread Road, alterations to sports pitches, alterations to parking arrangements, additional cycle parking and external landscaping works, fencing and floodlighting, at Sir Harry Smith Community College, Peterborough, Cambridgeshire.
Sir Harry Smith Community College Eastrea Road Whittlesey Cambridgeshire PE7 1XB
Non-material amendment to proposed sports provision relating to planning permission ref:CCC/22/039/FUL, for Development of Sir Harry Smith Community College from 6 forms of entry to 8 forms of entry with expansion of sixth form, including a two-storey teaching block with link, pedestrian/cycle access to Drybread Road, construction access to Bassenhally/Drybread Road, alterations to sports pitches, alterations to parking arrangements, additional cycle parking and external landscaping works, fencing and floodlighting, at Sir Harry Smith Community College, Peterborough, Cambridgeshire.
Sir Harry Smith Community College Eastrea Road Whittlesey Cambridgeshire PE7 1XB
Metal Recycling Facility for the storage, sorting, separation, grading, sheering, baling, compacting, crushing, granulating and cutting of ferrous metals or alloys and non-ferrous metals.Informative: this application seeks to change the existing authorised waste site from plastics recovery facility and recycling of automotive shredder residue (ASR) to metal recycling .
Saxon Works Peterborough Road Whittlesey Peterborough PE7 1PJ
Importation of controlled inert construction and demolition wastes for the buttressing and stabilisation of the southern face of a former mineral excavation face with associated screening, stockpile and storage areas.
New Saxon Works Peterborough Road Whittlesey PE7 1PD
Section 73A planning application to continue the importation of controlled inert wastes for the buttressing, stabilisation and restoration of a former mineral extraction face together with an associated waste reception area. Informative: Section 73 planning application to vary conditions 5 & 6 (Temporary Duration of Permission) of planning permission CCC/22/092/VAR to amend the timescale for restoration.
Land At Saxon Pit Peterborough Road Whittlesey Peterborough Cambridgeshire PE7 1PD
Partial demolition, refurbishment and the erection of part single/part 2-storey extensions to provide 1250 place secondary school with community facilities; additional tennis courts and Multi Use Gaming Area; alterations to existing access, drop off area and car park; hard and soft landscaping and the use of temporary buildings for the duration of development
Sir Harry Smith Community College Eastrea Road Whittlesey Peterborough PE7 1XB
Variation of Conditions 4, 10 and 11 of F/02019/12/CW to allow other shredder residue waste from mixed waste types to be brought to and processed at the site.
Variation of Condition 8 of planning permission F/00915/94/CW to allow an increase in permitted stockpile heights at the site from 3 metres to 6 metres
Whitewalls Eldernell Lane Coates Peterborough Cambridgeshire PE7 2DD
Variation of Conditions 5 & 6 of planning permission F/02026/02/CW to extend the date by which the importation and deposit of waste fill material must cease from 30/09/13 to 28/05/16 and to extend the date by which site preparation, importation of inert waste fill material, buttressing, stabilization and restoration must cease and a revised restoration scheme must be completed from 30/05/2015 to 28/11/2017.
Construction of a building for use as a waste transfer station; 2 portacabins; toilet block and associated infrastructure including weighbridge and weighbridge office.
Land To The East Of Aaron Road Whittlesey Cambridgeshire PE7 2EX
Change of use from B1/B8 use to Waste Transfer Station; erection of two portacabins, toilet block, weighbridge; extension of concrete area and additional vehicle parking
Land To The East Of Aaron Road Industrial Estate Whittlesey Peterborough Cambridgeshire PE7 2EX
Change of use of land and buildings from agricultural washing, packing, storage and distribution to the importation and dismantling of end-of-life vehicles and export of dismantled scrap parts from site for final disposal
Crease Bank Briggate West Whittlesey Cambridgeshire PE7 1DJ
Change of use of brickworks to Plastic Recovery Facility (PRF) and erection of trommel to import Automotive Solid Residue (ASR) for sorting and shredding into component parts suitable for exportation for use as Refuse Derived Fuel (RDF) off site
The Former Saxon Brickworks Site Peterborough Road Whittlesey Cambridgeshire PE7 1PJ
Erection of Gas to Grid Anaerobic Digestion Plant to comprise four digester tanks, technical operations building, silage clamp, storage lagoons, four liquid waste tanks, gas flare, gas upgrading system (GUS) and gas entry unit (GEU), separator, cooling unit, transformer, heating kiosk & two underground propane tanks
Application with Peterborough City Council ref 16/00080/MMFUL. Erection of Gas and Grid Anerobic Digestion Plant to comprise four digester tanks, technical operations building, sileage clamp, storage lagoons, four liquid waste tanks, Gas Flare, Gas Upgrading System (GUS) and Gas Entry UNit (GEU), seperator, cooling unit, transformer, heating kiosk and two underground propane tanks.
Land Adjacent To Horsey Toll Farm Whittlesey Road Stanground Peterborough PE7 2PP
Change of use of unit 31B and yard from B8 (storage or distribution) for use as a waste processing station with recycling in association with the existing waste processing and recycling use of 31A Aaron Road, Whittlesey, PE7 2EX
31A And 31B Aaron Road, Vandens Whittlesey PE7 2EX
Change of use from a waste transfer station to a waste transfer station and a facility for processing commercial and industrial non-hazardous wastes within the existing waste transfer building for the production of refuse derived fuel; storage of empty bins and parking of waste collection vehicles; erection of an office/storage building; and laying of impermeable hardstanding.
The erection of a 7 bay mobile classroom building, access ramp, play deck with canopy and paved path for a temporary period until 31 August 2022 to enable the existing preschool to be relocated into the temporary accomodation.
New Road Primary School New Road Whittlesey Peterborough PE7 1SZ
The erection of a 7 bay mobile classroom building, access ramp, play deck with canopy and paved path for a temporary period until 31 August 2022 to enable the existing preschool to be relocated into the temporary accomodation.Condition 3: Acoustic Fence
New Road Primary School New Road Whittlesey Peterborough PE7 1SZ
Section 73 planning application to develop land without complying with condition 1 of planning permission F/2009/16/CW (Extension to existing wood waste recycling facility and erection of workshop) to allow operation of wood waste recycling facility until 30 June 2023
Section 73 planning application to develop land without complying with condition 1 of planning permission F/2009/16/CW (Extension to existing wood waste recycling facility and erection of workshop) to allow operation of wood waste recycling facility until 30 June 2023Condition No 13. Barrier to Site Boundary
Planning Permission: F-2006-18-CW - Section 73 planning application to develop land without complying with condition 1 of planning permission F-2009-16-CW (Extension to existing wood waste recycling facility and erection of workshop) to allow operation of wood waste recycling facility until 30 June 2023.Unit 1, Benwick Road, Whittlesey, PE7 2HDApplication for approval of details reserved by condition 13 (scheme for erection of a barrier)
Section 73 application to develop land without complying with condition 3 (approved plans), condition 5 (annual throughput) & condition 6 (operating hours) of planning permission F/02001/13/CW for a wood waste recycling facility (part retrospective)
Unit 1 35 Benwick Road Industrial Estate Whittlesey PE7 2HD
By clicking 'Agree' you consent to receiving marketing emails from us (you can change this preference at any time) and the immediate performance of the contract and acknowledge that you thereby lose your right of withdrawal. See Terms and Conditions for more information.
Landcycle is not currently optimised for smaller screens. Please use a desktop or laptop to access the site.
Customize Consent Preferences
We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.
We also use third-party cookies that help us analyze how you use this website, store your preferences, and provide the content and advertisements that are relevant to you. These cookies will only be stored in your browser with your prior consent.
You can choose to enable or disable some or all of these cookies but disabling some of them may affect your browsing experience.
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
No cookies to display.
Functional
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
No cookies to display.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
_ga_
1 year 1 month 4 days
Google Analytics sets this cookie to store and count page views.
_ga
1 year 1 month 4 days
Google Analytics sets this cookie to calculate visitor, session and campaign data and track site usage for the site's analytics report. The cookie stores information anonymously and assigns a randomly generated number to recognise unique visitors.
_gid
1 day
Google Analytics sets this cookie to store information on how visitors use a website while also creating an analytics report of the website's performance. Some of the collected data includes the number of visitors, their source, and the pages they visit anonymously.
_gat_gtag_UA_
1 minute
Google Analytics sets this cookie to store a unique user ID.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
No cookies to display.
Advertisement
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.